Art View Hotel

A complete hotel project in Riyadh on King Abdullah Road – from structural execution to operational readiness, with construction, architectural, finishing, furnishing, and turnkey delivery works

City Riyadh - King Abdullah Road
Owner Mohammed bin Faraj
Area 2,500 م²
Cost 80,000,000 ريال سعودي
Request Consultation & Quote for This Project Instant Inquiry via WhatsApp

From Structural Execution to Operational Readiness

Project Overview

Art View Hotel is one of the integrated hotel projects within the portfolio of Al-Natihat Construction Contracting Company. The company undertook the execution and coordination of a wide scope of works, starting from structural phases, through architectural, mechanical, and finishing works, up to furnishing, equipping, and final handovers. The execution relied on engineering coordination across disciplines, interface management, field supervision, and quality control to achieve integration between the project's architectural, technical, and operational requirements.

Project Data

SectorHospitality & Hotels
LocationRiyadh - King Abdullah Road
Area2,500 m²
Project Value80,000,000 SAR
Contract ScopeIntegrated Execution - Turnkey Delivery
Project StatusCompleted

Role of Al-Natihat Construction Contracting Company

The company managed, executed, and coordinated the full scope of the integrated project, including organizing execution phases, coordinating structural, architectural, and mechanical works, managing finishes, furnishing, and hotel fixtures, in addition to implementing quality assurance procedures and stage-wise and final handovers until reaching operational readiness.

Scope of Execution

  • Structural and building works.
  • Interior and exterior architectural works.
  • Electrical, mechanical, and plumbing works (MEP).
  • HVAC systems.
  • Ceilings, gypsum, paints, and cladding.
  • Flooring, doors, and final architectural details.
  • Hotel room finishing and furnishing.
  • Supply and installation of furniture and hotel fixtures.
  • Execution, furnishing, and equipping of the reception area.
  • Corridors, shared areas, and public facilities.
  • Execution and equipping of the swimming pool and parking areas.
  • Technical tests, inspections, and corrective actions.
  • Final closing works and preparation for handover and operation.

Coordination & QA/QC

Quality assurance and control procedures were implemented throughout the project phases to verify compliance of materials and executed works with approved drawings and technical specifications. These included material inspection, stage-wise handovers, execution and finishing quality monitoring, system testing, observation tracking and remediation, and final inspection prior to handover.

Project Deliverables

Delivery of a complete hotel project that combines execution quality, attention to detail, and operational efficiency, through the integration of structural, architectural, mechanical, finishing, furnishing, and equipping works.

Scope of Work & Engineering Supervision Details:

Integrated Execution - Turnkey Delivery

All structural, finishing, and detailed planning works for this project have been executed in accordance with the latest engineering codes adopted in the Kingdom of Saudi Arabia, under the direct supervision of Al-Natihat Construction Contracting Company's engineering team.